Dashboard Overview

Project Analytics and KPI metrics based on current configurations.

🔒 View-Only Mode: Rate adjustments and estimates are locked. Click "Admin Access" to modify.
Expected Effort
⏱️
0 hrs
95% Range: 0h - 0h
Calculated Budget
💰
₹0
Base: ₹0 | Cont: 0%
Risk Multiplier
⚠️
1.00x
Risk Score: 0/100
Project Duration
📅
0 Days
UI Dev: 0d | Integration: 14d
Effort Distribution by Module Hours allocated per BRD module area
Team Share % of effort by role
Proposal Metadata

Enable/Disable modules below. Disabled modules automatically zero-out relevant estimates and mark items as "Out of Scope" in the proposal.

Development progress is calculated based on the selected scope. The project covers a strict 6-month development timeline (26 Weeks / 13 Sprints).

Overall Development Progress
0%
0 of 13 Sprints In-Scope 0 of 0 Total Hours
Interactive Project Roadmap & Sprint Schedule
Click on any colored sprint bar to inspect scope, view task details, or update the progress status.
Planned In Progress Completed Excluded
Phase / Module S1
W1-2
S2
W3-4
S3
W5-6
S4
W7-8
S5
W9-10
S6
W11-12
S7
W13-14
S8
W15-16
S9
W17-18
S10
W19-20
S11
W21-22
S12
W23-24
S13
W25-26

The backend interfaces with the OCPI 2.2.1 protocol. Toggle endpoints below to include them in the client integration scope.

Method Endpoint Route OCPI Module Backend Complexity SOW Requirement Mapping
Module Task Description Role Opt (O) Likely (M) Pess (P) PERT (E) StdDev

Configure team roles and hourly billing rates. Backend and QA roles are excluded as per project constraints.

Resource Role Hourly Billing Rate (₹) Assigned Capacity (FTE) Subtotal Cost Share
6-Month (180 Days) Development Capacity Validation

The total project development effort of 1,969.3 hours aligns precisely with the resource capacity of the team over the 180-day (6-month) calendar timeline:

  • 6 Months Calendar duration = 180 days, which translates to exactly 128.5 working days (excluding weekends).
  • At 8 working hours per day, a 1.0 FTE resource has a maximum capacity of 1,028 hours over 6 months.
Resource Role Total Mapped Effort Available FTE Capacity FTE Allocation %
Junior UI Developer (1.0 FTE) 1,025.0 hrs 1,028.0 hrs 99.7%
Junior API Developer (1.0 FTE) 367.5 hrs 1,028.0 hrs 35.7%
Senior UI Developer (2.0 FTEs) 576.8 hrs 2,056.0 hrs 28.0%
Total Dev Effort 1,969.3 hrs 4,112.0 hrs 47.9%

Note: The Junior UI Developer is 99.7% allocated to UI development. The Junior API Developer is engaged at 35.7% to build API integrations in parallel. The Senior UI Developers (28% allocation) provide architectural guidance, code reviews, and governance to ensure success within the 180-day deadline.

Project risk assessment parameters aligned with Section 9 of the Client BRD. Risk ratings directly determine the project contingency buffer applied to the base development cost.

Risk Score Calculation Basis & Methodology
  • Individual Risk Score Formula: Risk Score = Likelihood (1-5) × Impact (1-5). Individual scores range from 1 (Very Low) to 25 (Critical).
  • Total Project Risk Score: Sum of scores across all active BRD risk categories (Current score: 56 / 150).
  • Contingency Buffer Formula: Contingency Buffer % = (Total Risk Score / 100) × 30%.
  • Current Contingency Buffer: At a risk score of 56, the applied contingency buffer is 16.8% (17%), added directly to base labor cost to insulate against third-party CPO delays and OCPI telemetry integration risks.
Risk Item Mitigation Strategy Likelihood (1-5) Impact (1-5) Risk Score
Document Status
CONFIDENTIAL DRAFT

Includes risk buffers, OCPI API scoping details, and client-side integration tasks.